Control and Operation Work Packages

WP 28: Control Systems

  • Conventional timing issues
  • Overall slow control for the entire machine
  • Automatic procedures (e.g. beam based corrections, failure recovery)
  • Data analysis software
  • Files systems and databases
  • User interfaces
  • Work Package Leader: K. Rehlich (Desy)

WP 35: Radiation Safety

WP 36: General Safety

  • Analysis of general safety issues
  • Implementation of general safety procedures and techniques
  • Electrical safety
  • Procedures
  • Work Package Leader: S. Mohr (Desy)

WP 38: Personnel Interlock

WP 39: ElectroMagnetic Compatibilty

 