Accelerator Sub-Systems Work Packages
WP 12: Warm Magnets
Design of all warm magnets for the entire machine
Production or contact to production sites
Work Package Leader:
B. Krause
(Desy)
WP 14 : Injector
Long. internal bunch structure?
Cavity tilts/coupler kicks?
Bunch parameter space: low eps w. low charge/higher compression (or vice versa)?
Rep. rate and duty cycle?
Work Package Leader:
K. Flöttmann
(Desy)
WP 15: Bunch Compression and Start-to-End Simulation
Compressors: parameter space: lower charge/higher compression (or vice versa)?
Sensitivity of bunch shape/structure vs. charge, phase, etc. fluctuations?
Energy at BC-III variable (at BC-II??)? impact on energy vs. rep rate issue?
FODO-type stage desirable (possible)?
Switch yard
Collimators
Incorporation of FEL/SASE processes (undulators)
Work Package Leader:
T. Limberg
(Desy)
WP 16 : Lattice Design and Beam Optics/Dynamics
Main linac and BC matching
Orbit correction & beam-based methods
Collimation and diagnostic section
Beam transport and distribution to user beam lines
Orbit stability/stabilisation (slow and fast feedback)
Lattice in undulator systems, phase shifters, correctors, matching sections
Transfer to dump
Work Package Leader:
W. Decking
(Desy)
WP 17: Standard Beam Diagnostics
BPMs
Screen monitors
Beam intensity and loss monitors
Work Package Leader:
D. Nölle
(Desy)
WP 18: Special Beam Diagnostics
Slice parameters and longitudinal phase space diagnostics
Sub-picosecond timing and synchronization
Other specialized devices
Work Package Leader:
C. Gerth
(Desy)
WP 19: Warm vacuum
Warm beam pipe distribution starting from switch yard
Bunch compressors
Undulator vacuum
Exit chambers to beam dumps
Exit windows
Work Package Leader:
S. Lederer
(Desy)
WP 20: Beam Dumps
Modifications to adapt to new site?
Else?
Work Package Leader:
N. Tesch
(Desy)
WP 21: FEL Concepts
simulation of FEL and spontaneous radiation
new FEL concepts
coordinating accelerator-related activities
Contact Person :
M. Yurkov
(Desy)
AMTF Log Book
Construction Log Book
EDMS Tree Browser
browse the WBS structure in EDMS (login required) [
More
]
Imprint
|
Data Privacy Policy
|
Contact
|
Sitemap
|
Recommend page
| © 2024 Deutsches Elektronen-Synchrotron DESY
European Project Team
Steering Committee
TDR
PFU
Electron Beam Parameter
Photon Beam Parameter
Science (old)
XFEL Optics
Past Workshops
TDR Workshops
News
Cavity Production
RF Measurements
RF-Tests
Templates
Meetings
Work Packages
Links of Interest
Reviews
Important Dates
Naming Conventions
TGA Room Book
Electronics Racks
Cabling Issues
Pictures
XPO
PPR
Project Handbook
Status Finances
MSPE4XFEL
Summaries (XFEL internal)
DIR Reports
Financial Status
2016
2015
2014
2013
2012
2010/11
Internal
We use cookies to provide full functionality of our website.
OK
More information