Technical Coordination Team will carry out the general rack coordination and administration, utilizing KDS (Kabel Dokumentation System) and the IDEAS / JT based 3D master models. |
|
Detailed information about KDS can be found at the following web page. |
|
|
|
RACKS INVENTORY |
|
Version 6.12 is current version of document summarizing status of Rack planing (released on 12.04.2012). |
|
|
|
RACK REQUIREMENTS AND DESIGN |
|
XTL Tunnel Racks Specifications are summarised in the following document |
|
Schroff: cooling issue |
|
|
XTL Bodenplatten |
|
|
RADIATION SHIELDING ISSUE |
|
Actual information about the status of electronics rack shielding issue is summarised in the following document: D*2603891 |
|
Radiation Shielding for Electronic Devices Operating in XFEL Environment |
|
Summary of FLASH/XFEL scaling factor discussion (26.06.2009) |
|
TESLA-FEL Report 2008-06 |
|
|
|
ELECTROMAGNETIC COMPATIBILITY (EMC) |
|
Information about electromagnetic compatibility (EMC) at the XFEL is being published as a structured list of answers to frequently asked questions (FAQ): |
|
|
|
General rack coordination and administration activity will be steered by E. Negodin (Tel. : 15-04) |
|