The overall organization chart of the XFEL project down to the level of work packages is shown below. The links in the table will direct you to more information about the organizational unit you selected.
WPG-1 LINAC |
WP-01 RF System |
WP-02 Low Level |
WP-03 Accelerator Module |
WP-04 SC Cavities |
WP-05 Power Coupler |
WP-06 HOM Coupler |
WP-07 Frequency Tuner |
WP-08 Cold Vacuum |
WP-09 String Assembly |
WP-11 Cold Magnets |
WP-46 3.9 GHz System |
WPG-2 Acc. Sub-Systems |
WP-12 Warm Magnet |
WP-14 Injector |
WP-15 Bunch Compressor |
WP-16 Lattice |
WP-17 Standard Beam Diagnostic |
WP-18 Special Beam Diagnostic |
WP-19 Warm Vacuum |
WP-20 Beam Dumps |
WP-21 FEL Concepts |
WPG-3 Photon Beam Systems |
WP-71 Undulators |
WP-72 Simulation of Photon Fields |
WP-73 X-ray Optics & Beam Transport |
WP-74 X-ray Photon Diagnostic |
WP-75 Detector Development |
WP-78 Optical Lasers |
WP-79 Sample Environment |
WP-81 Scientific Instrument FXE |
WP-82 Scientific Instrument HED |
WP-83 Scientific Instrument MID |
WP-84 Scientific Instrument SPB |
WP-85 Scientific Instrument SQS |
WP-86 Scientific Instrument SCS |
WP-90 Control and Analysis Software |
WP-91 Advanced Electronics |
WP-92 IT and Data Management |
WPG-4 Control & Operation |
WP-28 Control System |
WP-35 Radiation Safety |
WP-36 General Safety |
WP-38 Personnel Interlock |
WP-39 EMC |
WPG-5 Infrastructure |
WP-10 AMTF |
WP-13 Cryogenic |
WP-32 Survey & Alignement |
WP-33 Tunnel Installation |
WP-34 Utilities |
WP-40 Information & Process Support |
WPG-6 Site & Buildings |
WP-31 Site & Civil Construction |
WP-41 Site Lot 1 |
WP-42 Site Lot 2 |
WP-43 Site Lot 3 |
WP-44 Site Engineering |
WP-45 AMTF Hall |
WP-47 Above Ground Lots 4-7, 9 |
WP-48 Above Ground Lot 8 |
Chair |
|
Co-Chair |
Cold Linac Coordinator |
|
Technical Coordinator |
|
Machine Layout Coordinators |
|
Project Office Leader |
|